PhD References – December 2012   Leave a comment

>>  Multilevel Visulaisation of Clustered Graphs

        Peter Eades

Posted December 28, 2012 by mithileysh in Supervisory Meetings

Supervisory Meetings – December 2012   Leave a comment

6/12/2012

>> Before Meeting

Tasks accomplished :

  • Completed the Research Plan – Research_Plan_v4_Mithileysh.pdf.
  • Jim helped me out with Inkscape, usage of definitions in Latex and directions to pull Jean’s code from Github.

>> After Meeting

Action Plans – Mithileysh

  • Work on the sections suggested by the supervisors.

Action Plans – Supervisors

  • Once the new version of the research plan is emailed, Please read the sections modified and give me the feedback.

——————————————————————————————————————————————————————-

13/12/2012

>> Before Meeting

Tasks accomplished :

  • Completed the Research Plan – Research_Plan_v5_Mithileysh.pdf.
  • I worked on sections 2.5, 2.6, 2.7, 2.8, 3.1, 3.2 and 3.3.

>> After Meeting

Action Plans – Mithileysh

  • Work on the sections suggested by the supervisors.

Action Plans – Supervisors

  • Once the new version of the research plan is emailed, Please read the sections modified and give me the feedback.

——————————————————————————————————————————————————————

20/12/2012

>> Before Meeting

Tasks accomplished :

  • Completed the Research Plan – Research_Plan_v5_Mithileysh.pdf

>> After Meeting

The extended summary of the Supervisory meeting is as follows:
The suggestions given by Jim are:
WORK PLAN
Work package 1: Describe in detail about definitions, framework for Euler diagrams and check Gem’s comments for 1(b). Include Research Plan, RMM Modules and short term goals.
Work package 2: Describe in detail about the algorithms and software implementation.
Work package 3(a) To design the study including ethical review/approval.
                     3(b) To carry out the empirical study.
                     3 (c) To analyze the results obtained and reflect on their implications.
Work package 4: Reflective stage of the work – Literature Review, Thesis writing, community engagement, proofreading for the supervisors.
RISK MANAGEMENT
 
(a) Formal theoretical work takes much longer than anticipated. Supervisors need to monitor the progress of the framework.
(b) Software implementation runs into technical problems such as difficulty in implementing the algorithm in a computationally effective way (It is an impact risk). It has low likelihood occurrence because of the work is building on the existing techniques.
(c) Personal issues to be considered which might stop the progress of the work (eg: illness)

Action Plans – Mithileysh

  • Improve the contents, work package and risk management. Complete the Research Plan along with the RPA form and the Work Plan chart.

Action Plans – Supervisors

  • Once the new version of the research plan is emailed, Please read the sections modified and give me the feedback.

Posted December 20, 2012 by mithileysh in Supervisory Meetings